header

Building Applications*

Minimum Permit Fee$40.00
Commercial Construction$.20 per sq. ft.
Residential
Useable Area Under Roof:
Mobile Homes$.10 per sq. ft.
Modular $.10 per sq. ft.
(all Site Built habitable space)$.12 per sq. ft.
Basement$.12 per sq.ft.
Unfinished, future habitable 2nd or 3rd floor$.12 per sq.ft.
Finish existing space after Certificate of Occupancy is issued $.10 sq.ft.
Decks $.10 per sq. ft.
Unattached garage, sheds, porches,$.10 per sq. ft.
Carports, storage buildings
Pole shed $.10 per sq. ft.
Remodeling, alterations, structures not listed $5.00 per $1,000, $500.00 max.
Signs $25.00 minimum; $.05 per sq. ft.
Chimney, fireplace, heaters$10.00 per $1,000
Fences, where required by Zoning Ordinance $10.00 per $1,000
Bulkheads, jetties, piers$10.00 per $1,000
Boathouses $.10 per sq. ft.
Pools $10.00 per $1,000
Relocation fee $.10 per sq. ft.
Demolition fee$25.00
Reinspection fee 1stFree/2nd $50.00/ 3rd + $100.00 ea.
Temporary Certificate of Occupancy$50.00 / 6 months
Plans Review
Residential (Site Built dwellings only)$50.00
Commercial$50.00/ 1000sf.
(*) Whenever work has begun prior to issuance of a permit, the fee shall be doubled.
Plumbing Permit Application*
Minimum Permit fee$40.00
Per fixture$5.00 each
(*) Whenever work has begun prior to issuance of a permit, the fee shall be doubled.
Mechanical Permit Application*
Minimum Permit fee$40.00
Heat pumps, furnace, etc$10.00 per $1,000
Water, oil, commercial tanks $10.00 per $1,000
(*) Whenever work has begun prior to issuance of a permit, the fee shall be doubled.
Electrical Permit Application*
Minimum Permit Fee$40.00
Service panel$.25 per amp
Electrical heat$1.00 per K.W.
Temporary pole$50.00
Reconnect fee$50.00
Relocate$50.00
Motors $2.00
Air Handler$2.00
Range$2.00
Water Heater$2.00
Other Circuits$2.00
Backup Generator$50.00
(*) Whenever work has begun prior to issuance of a permit, the fee shall be doubled.
Amusement Devices*
Kiddie$10.00
Major$20.00
Spectacular$40.00
(*) Whenever work has begun prior to issuance of a permit, the fee shall be doubled.
(**) All building department permit fees subject to state levy
• Church worship facilities shall be exempt from the development and construction permit fees of this Ordinance.
• School facilities construction utilizing school maintenance personnel or volunteer labor shall be exempt from the development and construction permit fees of this Ordinance.
• Volunteer Fire and Rescue facilities construction utilizing Fire or Rescue personnel or volunteer labor shall be exempt from the development and construction permit fees of this Ordinance.
• Permit application fees are nonrefundable regardless of whether the permit application is approved, denied or withdrawn once submitted.
This ordinance shall be effective immediately upon adoption.
Adopted June 1, 2010

Free viewers are required for some of the attached documents. They can be downloaded by clicking on the icons below. Download Acrobat Reader Download Flash Player Download QuickTime Download Windows Media Player Download Microsoft Silverlight Download Word Viewer Download Excel Viewer Download PowerPoint Viewer